Acid stain (Topping System)

Fresh Cut sal Acid stain, is an Acid Based liquid installed on old or newly poured concrete floors, interior or exterior surfaces.
 
The concrete slabs should be cured for at least 24 days before Fresh Cut sal Acid stain application. This system needs lots of time to be executed, especially when applied on new concrete slabs.
 
Fresh Cut sal Acid Stain liquid, penetrates the concrete surface, reacts with the moisture found within the concrete slab and produces a wide range of metallic colors and effects.

Some of our Projects

Brown
Metalic
Stained
Stained brown
Acid
Amber
Beauty
Go To Top